FMX Support
Center

 

support

Follow

Planned Maintenance Import Instructions

The Planned Maintenance Import Template can be used to mass import planned maintenance tasks and instruction sets into your FMX site.

Note: When you have completed the template, please email it to support@gofmx.com to have the import uploaded to your FMX site. 

All fields with an asterisk (*) are required.

Download the Planned Maintenance Import Template at the bottom of this page and follow the instructions below:

Instruction Sets Sheet (this sheet is optional) - Instruction sets are detailed step-by-step checklists that you can associate with planned maintenance tasks. Follow the steps below to create an instruction set: 

  • Name* - this will be the name for the step-by-step checklist (e.g., HVAC Monthly PM, Check Belt Tension).
  • Description (optional) - this is where you can describe what the instruction set will be used for. 
  • Steps* - this is where you list all of the steps in the checklist. Type one step then press Atl+ Enter to enter the next step. Numbering is not required.

Tasks Sheet - Tasks are recurring planned maintenance events in FMX. Follow the steps below to create tasks. 

  • Instruction Set (optional) – this name must match what is entered in the "Instruction Sets" sheet or what already exists on your FMX site. If no instruction set is required for the task then leave this cell blank. 
  • Name* - this will be the name of the task (e.g., AHU #1 Quarterly PM, Check Belt Tension – Monthly).
  • Building* - this is the building where the task will take place. Building names must match what already exists on your FMX site.
  • Equipment (optional) - leave blank if the task is not associated with equipment. If you want to associate the task with equipment, this is where you would add the Equipment Tag (e.g., AHU # 1, Exhaust Fan 12, Fire Extinguisher). Equipment names must match what already exists on your FMX site.
  • Due Date* - this is the first time the task will occur (format should be mm/dd/yy).
  • Repeat* - this is the frequency of the task occurrence (Daily, Weekly, Monthly, Yearly).
    • If you select Daily, follow the next step:
      • Every X days - enter how many days it should occur (e.g., enter a 1 for every day, enter a 5 for every 5 days).
    • If you select Weekly, follow the next steps: 
      • Weekly Sun-Sat – enter a 1 in all days that it should occur.
      • Every X weeks - enter how many weeks you want this to occur (e.g., put a 1 for every week, put a 4 for one week out of the month). 
    • If you select Monthly, follow the next steps: 
      • Mode - select which of the following monthly repeating methods you would like to use from the drop down list provided in the cell:
        • Day of the month: The task will repeat on the same date (e.g., the 20th of every month).
        • Day of the week: The task will repeat on the same day of the week (e.g., the first Monday of every month).
        • Weekday of the Month: The task will repeat on the same date unless it falls on a weekend in which case it is rescheduled to the nearest weekday.
        • Weekend Day of the Month: The task will repeat on the same date unless it falls on a weekday in which case it is rescheduled to the nearest weekend day.
      • Every X months - enter how many months you want this task to occur (e.g., put a 1 for every month, put a 3 for every 3 months).
    • If you select Yearly, follow the next steps: 
      • Every X years - enter how often you would like it to occur (e.g., 1 for every year, 4 for every 4 years).
    • Variable (optional) - enter 'Y' or '1' if this task is variable. This means that the task will populate on the calendar based on the last time the task was executed instead of based on the initial due date assigned for the task. 
    • Assigned users (optional) - enter the email address of the person you wish to assign to this task. If you would like to assign multiple users then press Ctrl + Enter to move to the next line. User names must match what already exists on your FMX site.
    • Outsourced - enter a 1 if the task is outsourced and enter a 0 if the task is internal. 

 

Was this article helpful?
0 out of 0 found this helpful
Have more questions? Submit a request

Comments

Contact Us

If you can’t find the answer you are looking for, contact support@gofmx.com.


Questions about FMX? We’re here to help!

We are a dedicated team of individuals who are passionate about helping people have better lives.
We’ll make sure your team gets up and running quickly and smoothly with FMX.
Give us a call at 1 (844) 664-4400 or send us an email at support@gofmx.com.

dedicated team of individuals